CUSTOM METAL & PLASTIC COMPONENTS

Metal and Plastic Parts, Made and Assembled to Your Drawing

Eleven processes — from die casting to final assembly — coordinated by one team in Dongguan. Prototype to mass production, 20–40 days lead time

Where Our Parts Go

Five industries, one supply chain — tooling, production and assembly coordinated by one team in Dongguan
Garden poles, plant hangers, bird feeder hardware, camping stands and ground anchors.
Door hinges, motor brackets, control panel bezels, handles and shelf supports.
Engine and chassis brackets, mirrors, guards, racks, towing parts and footpegs.
Joist hangers, anchor plates, splice plates, strut clamps and connection brackets.
Racks and load bars, mounting brackets, pivot pins, foot plates and machined links.

Eleven Processes, One Supplier

Different steps, one contact, from drawing to quotation to delivery

Die Casting

Aluminum and zinc components cast at our affiliated plant, then machined and finished to your drawing.

Metal Stamping & Punching

Progressive and compound dies, from prototype tooling through volume production runs.

Injection Molding

Eighteen presses from 160T to 1200T, running engineering plastics, ABS, PC and PA.

Surface Treatment

Anodizing, powder coating and plating, scheduled inside the same production plan.

Laser Cutting

Flat parts and brackets cut from sheet, paired with our bending line for formed components.

Assembly

Sub-assemblies and finished units, packed and labeled to your SKU before shipment.
Also available: Bending & Forming · Welding · Tapping & Drilling · Polishing & Brushing · CNC Machining

67

Machines in Network
11
Processes covered
3
Affiliated plants
20-40
Days to delivery

From Drawing to Delivery

Four steps, one team, one schedule, one inspection point

01

Send Your Drawing

STEP, DWG, PDF or a physical sample. NDA available before you share anything.

02

Engineering Review

DFM feedback on wall thickness and tolerance, with a quotation in 24–48 hours.

03

Tooling & Sampling

First article in 7–15 days, shipped with a dimensional inspection report.

04

Production & Assembly

20–40 days, including surface finishing, sub-assembly and packing to your SKU.

Send Us Your Drawing. Start a Long-Term Partnership.

Quote in 48 hours. No minimum for samples — most customers start with one part and stay for years.